Contract 140R1023C0008
Garco Construction, Inc. · Department Of The Interior · June 27, 2024
Garco Construction, Inc. was awarded a federal contract by Department Of The Interior (Bureau Of Reclamation) on June 27, 2024 for $22.73 million of work in other heavy and civil engineering construction. Performance is in Cle Elum, WA. It was awarded under full and open competition. The contract has been modified 23 times since the base award It uses firm fixed-price contract pricing. The most recent modification was on June 12, 2026. If all options are exercised, the contract could reach $59.33 million.
Contract details
- PIID
- 140R1023C0008
- Award type
- Definitive Contract
- Pricing
- Firm Fixed Price
- Set-aside
- No Set Aside Used.
- Competition
- Full And Open Competition
- NAICS
- 237990 · Other Heavy And Civil Engineering Construction
- Product / service
- Construction Of Other Non-Building Facilities
- Place of performance
- Cle Elum, WA
- First action
- June 27, 2024
- Latest action
- June 12, 2026
Description
CLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: RFI-229 LOUVERS
Modification timeline
-
June 12, 2026Mod P00051 · Change Order$55.82M
-
March 27, 2026Mod P00049 · Definitize Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: DEFINITIZATION OF P00009, P00010, P00015, AND P00028 TEMPORARY CONTAINMENT STRUCTURE$55.80M
-
March 19, 2026Mod P00048 · Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: RIVERBED CHANGES$55.37M
-
February 13, 2026Mod P00046 · Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: RFI 218 HI 9.8 PUMP SPEC CHANGE$55.36M
-
February 13, 2026Mod P00047 · Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: RFI 186 EQUIPMENT BOLLARDS$55.36M
-
December 31, 2025Mod P00045 · Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: RFI 206 FALSE WEIR DRAIN VALVE STEM GUIDE$55.34M
-
December 30, 2025Mod P00044 · Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: RFI 198 FISH LOCK WALL REVISIONS$55.34M
-
December 30, 2025Mod P00043 · Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: PIT TAG BLOCK OUTS$55.34M
-
December 29, 2025Mod P00042 · Change OrderCLE ELUM DAM FISH PASSAGE ADULT COLLECTION FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: STILLING BASIN CLEANING FOR REPAIR IDENTIFICATION$55.32M
-
December 15, 2025Mod P00041 · Definitize Change OrderCLE ELUM DAM FISH PASSAGE FACILITY ADULT FACILITY, YAKIMA RIVER BASIN WATER ENHANCEMENT PROJECT, WASHINGTON: DEFINITIZE P00018 DAVIT ARM SYSTEMS$55.29M
Similar contracts
| Recipient | Agency | Date | Obligated |
|---|---|---|---|
| Mcmillen, Inc. | Department Of The Interior | July 2, 2026 | $20.95M |
| Firelake Construction Inc | Department Of The Interior | July 1, 2026 | $7.02M |
| Kc Construction Co | Department Of The Interior | July 1, 2026 | $7.24M |
| Ascorp Inc | Department Of The Interior | July 1, 2026 | $430.3K |
| Marine Diving Solutions, Llc. | Department Of The Interior | June 30, 2026 | $9.78M |
| Ttp Contracting Group, Inc. | Department Of The Interior | June 26, 2026 | $33.7K |
Top contractors in NAICS 237990
Lifetime obligated dollars across all federal contracts in this NAICS code.
| # | Contractor | Contracts | Obligated |
|---|---|---|---|
| 1 | Thalle - Bauer Llc | 1 | $320.39M |
| 2 | Thalle Construction Co Inc | 2 | $175.41M |
| 3 | Kiewit-Alberici Siop Macc Ajv | 1 | $152.00M |
| 4 | Nan Inc | 4 | $88.60M |
| 5 | Orion Marine Construction, Inc. | 2 | $86.21M |
| 6 | Alberici Constructors Inc | 1 | $68.18M |
| 7 | Ge Renewables Us Llc | 3 | $67.95M |
| 8 | Hawaii Harbors Constructors Jv | 1 | $61.37M |
| 9 | Dragados/Hawaiian Dredging/Orion Jv | 1 | $53.26M |
| 10 | Manson Construction Co | 15 | $50.81M |
Track this on BesaGov
Get a free weekly email when this changes — new awards, new sub-awards, new opportunities. No login required.
Continue learning
Keep researching
Frequently asked questions
What is contract 140R1023C0008?
Contract 140R1023C0008 is a federal contract awarded to Garco Construction, Inc. by Department Of The Interior on June 27, 2024 for $22.73 million of work classified under OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. It has been modified 23 times since the base award.
Who won contract 140R1023C0008?
Garco Construction, Inc. won contract 140R1023C0008 from Department Of The Interior.
How much is contract 140R1023C0008 worth?
Contract 140R1023C0008 has obligated $22.73 million to date, with a total potential value of $59.33 million if all options are exercised.