Contract W911XK22C0006
Kokosing Alberici Traylor, Llc · Department Of Defense · July 15, 2024
Kokosing Alberici Traylor, Llc was awarded a federal contract by Department Of Defense (Department Of The Army) on July 15, 2024 for $271.01 million of work in other heavy and civil engineering construction. Performance is in Sault Sainte Marie, MI. It was awarded under full and open competition. The contract has been modified 28 times since the base award It uses firm fixed-price contract pricing. The most recent modification was on December 4, 2025. If all options are exercised, the contract could reach $1.94 billion.
Contract details
- PIID
- W911XK22C0006
- Award type
- Definitive Contract
- Pricing
- Fixed Price With Economic Price Adjustment
- Set-aside
- No Set Aside Used.
- Competition
- Full And Open Competition
- NAICS
- 237990 · Other Heavy And Civil Engineering Construction
- Product / service
- Construction Of Dams
- Place of performance
- Sault Sainte Marie, MI
- First action
- July 15, 2024
- Latest action
- December 4, 2025
Description
P00023 REA CH4 UNSUITABLE SOILS WINTER WORK. REA FOR COSTS INCURRED TO STAY ON SCHEDULE AFTER CH04 CAUSED THE CONTRACTOR TO INCUR DELAYS.
Modification timeline
-
December 4, 2025Mod P00023 · Supplemental Agreement For Work Within Scope$1.94B
-
November 28, 2025Mod P00022 · Supplemental Agreement For Work Within ScopeP00022 UNSUITABLE SOILS SCHEDULE RECOVERY. RELATED TO CH0004 UNSUITABLE SOILS. THIS WORK ENSURES THE CONTRACTOR CAN MEET THE ORIGINAL CONTRACT COMPLETION DATE DUE TO A DIFFERING SITE CONDITION.$1.94B
-
November 18, 2025Mod A00043 · Supplemental Agreement For Work Within ScopeA00043 OVERLOAD REGULATOR ARM. THERE ARE FATIGUE CONCERNS WITH THE ORIGINAL DESIGN. THIS DESIGN OVERCOMES THOSE CONCERNS TO ADDRESS THESE DESIGN ISSUES.$1.94B
-
November 14, 2025Mod P00021 · Supplemental Agreement For Work Within ScopeP00021 DAVIS WELL DISCHARGE PIPE. THE PIPE WAS IN A VERY DETERIORATED CONDITION, REQUIRING EXTENSIVE WORK TO FILL PER THE SPEC REQUIREMENTS, THAT WAS NOT KNOWN AT THE TIME THE DRAWINGS/SPECS WERE DEV…$1.94B
-
November 12, 2025Mod A00042 · Supplemental Agreement For Work Within ScopeA00042 NWP ELECTRICAL SUB BASEMENT CHECK VALVE. IT WAS DISCOVERED THAT A CHECK VALVE WAS NOT IN THE DRAINAGE PIPE TO PREVENT BACKFLOW. THIS MOD ADDS THAT VALVE.$1.94B
-
November 10, 2025Mod A00041 · Supplemental Agreement For Work Within ScopeA00041 DAVIS WELL DRAINAGE. DURING REVIEW OF THE CONSTRUCTION DRAWINGS IT WAS DISCOVERED THAT THERE WAS AN ELEVATION ERROR. THIS MOD CORRECTS THAT.$1.94B
-
October 15, 2025Mod A00040 · Supplemental Agreement For Work Within ScopeA00040 CELL 3 WEEP HOLES. THE COFFER CELLS IN CELL 3 ARE FILLING WITH WATER. THIS MODIFICATION ALLOWS FOR BUILDING DRAINAGE INTO THE CELL.$1.94B
-
September 11, 2025Mod A00039 · Supplemental Agreement For Work Within ScopeA00039 SHAFT 6 MINI SPLIT HVAC. THE SHAFT 6 WAS DESIGNED WITHOUT ANY HVAC, WHICH WILL NOT FACILITATE MAINTAINING A CONSTANT TEMPERATURE IN THE CONTROL BUILDING. THIS MODIFICATION PROVIDES THAT HVAC.$1.94B
-
September 11, 2025Mod A00038 · Supplemental Agreement For Work Within ScopeA00038 NEW PUMP WELL SUMP PUMP. IT WAS DETERMINED THROUGH THE SUBMITTAL PROCESS THAT THE PUMP WAS OVERSIZED. SO A CREDIT WAS CREATED TO RESIZE THE PUMP SMALLER AND RECOUP THE FUNDS.$1.94B
-
September 9, 2025Mod A00037 · Supplemental Agreement For Work Within ScopeA00037 CONNECTOR TUNNEL LIGHTING. THE CONNECTOR TUNNEL LIGHTING WAS MISSED IN THE DESIGN REVIEW. THIS MODIFICATION INSTALLS THE LIGHTING THAT IS NEEDED TO ILLUMINATE THE WORKSPACE.$1.94B
Similar contracts
| Recipient | Agency | Date | Obligated |
|---|---|---|---|
| Ecc Infrastructure Llc | Department Of Defense | December 31, 2025 | $3.52M |
| Bci Construction USA, Inc. | Department Of Defense | December 31, 2025 | $16.03M |
| Pine Bluff Sand And Gravel Company | Department Of Defense | December 30, 2025 | $1.53M |
| Nan Inc | Department Of Defense | December 30, 2025 | $134.50M |
| Dean Marine And Excavating, Inc. | Department Of Defense | December 30, 2025 | $0 |
| Viking Marine Construction Llc | Department Of Defense | December 30, 2025 | $0 |
Top contractors in NAICS 237990
Lifetime obligated dollars across all federal contracts in this NAICS code.
| # | Contractor | Contracts | Obligated |
|---|---|---|---|
| 1 | Thalle - Bauer Llc | 1 | $320.39M |
| 2 | Thalle Construction Co Inc | 2 | $175.41M |
| 3 | Kiewit-Alberici Siop Macc Ajv | 1 | $152.00M |
| 4 | Nan Inc | 4 | $88.60M |
| 5 | Orion Marine Construction, Inc. | 2 | $86.21M |
| 6 | Alberici Constructors Inc | 1 | $68.18M |
| 7 | Ge Renewables Us Llc | 3 | $67.95M |
| 8 | Hawaii Harbors Constructors Jv | 1 | $61.37M |
| 9 | Dragados/Hawaiian Dredging/Orion Jv | 1 | $53.26M |
| 10 | Manson Construction Co | 15 | $50.81M |
Track this on BesaGov
Get a free weekly email when this changes — new awards, new sub-awards, new opportunities. No login required.
Continue learning
Keep researching
Frequently asked questions
What is contract W911XK22C0006?
Contract W911XK22C0006 is a federal contract awarded to Kokosing Alberici Traylor, Llc by Department Of Defense on July 15, 2024 for $271.01 million of work classified under OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION. It has been modified 28 times since the base award.
Who won contract W911XK22C0006?
Kokosing Alberici Traylor, Llc won contract W911XK22C0006 from Department Of Defense.
How much is contract W911XK22C0006 worth?
Contract W911XK22C0006 has obligated $271.01 million to date, with a total potential value of $1.94 billion if all options are exercised.